children steam disinfection boiler mold maker p15052503
You can only provide the actual sample to us then we can help you to make the design drawings for your confirmation.After the mold is confirmed ,we can help you to try the mold for free.
You can only provide the actual sample to us then we can help you to make the design drawings for your confirmation.After the mold is confirmed ,we can help you to try the mold for free.
We promise: All customer-centric, never for short-term profit, and sell long-term benefits
We produce: Mold, prototype, injection molding, product assembly, surface printing, spraying the surface integration
Please provide: 2D, 3D, samples, or the size of the multi-angle pictures
Mould Time: 20-35 Days
Plastic product time: 7-15 Days
Moud precision: +/-0.01mm
Mould life: 300,000-1,000,000 shots
Producing Process:
Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode machining - Runner system processing - parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples
Mould cavity: One cavity, multi-cavity or different products be made together
Mould material: P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 etc.
Runner system: Hot runner and cold runner
Base material: P20,2738,2344,718,S136,8407,NAK80,SKD61,H13
Finish: Pitting the word, mirror finish, matte surface, striae
Standard: HASCO, DME or dependent upon
Main thechnology: Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc.
Software: CAD,PRO-E,UG Design Time: 1-3 days (normal circumstances)
Plastic product material:
ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS, TPV, TPO,TPR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS. etc
Quality system: ISO9001:2008
Equipment: CNC,EDM,Cutting off Machine,plastic machinery,etc plastic part