Mould Manufacturing

Plastic part of shower injection hot runner mold making manufacturer m15121404

The quality control techniques we have accumulated in the manufacture of plastic injection molds for glass bottles play a role in our technology for mass-producing perfectly identical glass bottles with dozens of molds, which in turn provides evidence for the uniformity and consistent quality of our molds.

We promise: All customer-centric, never for short-term profit, and sell long-term benefits

We produce: Mold, prototype, injection molding, product assembly, surface printing, spraying the surface integration

Please provide: 2D, 3D, samples, or the size of the multi-angle pictures

Mould Time: 20-35 Days

Plastic product time: 7-15 Days

Moud precision: +/-0.01mm

Mould life: 300,000-1,000,000 shots

Producing Process:

Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode machining - Runner system processing - parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples

Mould cavity:  One cavity, multi-cavity or different products be made together

Mould material: P20,2738,2344,718,S136,8407,NAK80,SKD61,H13 etc.

Runner system: Hot runner and cold runner

Base material: P20,2738,2344,718,S136,8407,NAK80,SKD61,H13

Finish: Pitting the word, mirror finish, matte surface, striae

Standard:  HASCO, DME or dependent upon

Main thechnology: Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc.

Software: CAD,PRO-E,UG  Design Time: 1-3 days (normal circumstances)

Plastic product material: 

ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS,   TPV,  TPO,TPR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS. etc

Quality system:  ISO9001:2008

Equipment:  CNC,EDM,Cutting off Machine,plastic machinery,etc plastic part